Back of the envelope calculations are a favorite tool for engineers; we love them so we can quickly pronounce that something's impossible, stupid, or criminal. Or maybe it might just work...
So here's a fun bit of guesswork using back of the envelope calculations: how big would a typical packing shed - maybe that Sewall Brown apricot pit plant which I was guessing used to be a Sunsweet plant? It's not on the Sanborn maps, and there's few pictures, so I don't know the actual size of the building. Luckily, this article from the Los Gatos Weekly Times references some period news reports of the fire that burned out Sewall Brown:
"Five units responded to the fire on Sept. 20, 1955, but the 53-year-old wooden stucture that was filled with 2,000 tons of apricot pits was lost, reported the Los Gatos Times-Observer."
Ok, we now know that Sewall Brown's building was probably built in 1902, and it was big enough for *4 million pounds* of apricot pits. A random site on the internet declares that apricot pits have a density of 440.78 kg/m3. If we do some math and conversions to and from metric, that implies that Sewall Brown had about 4000 m^3, or 111,000 cubic feet of apricot pits. That's a 100 x 139 foot barn, or a 100 x 69 foot barn packed 16 feet high.
That's an awful lot of apricot kernels. It almost seems like too many apricot kernels.
The Santa Clara County Fire District historic site has some photos with little detail, but cites this about that fire:
"Apricot pit fire, 20 September 1955. A processing plant, barn and tons of apricot pits were destroyed in this fire on the Santa Clara-Los Gatos road at Vasona Junction. The pits oil was extracted for use in cosmetics and other product. 25 firefighters from the Quito, Cambrian and San Tomas stations fought the blaze under the direction of B/C Jim Ackley. The heat was so intense that two firefighters, Captain Del Coombs and FF Roger Hodgson burned their hands trying to connect a hose to a fire hydrant 100 feet from the burning building. Bulldozers were used to spread the pits to hasten extinguishing of the fire. Lower left photo shows FF Ray Lubert and Captain Walt Cunningham working hoses over the red hot pits. Photos from newspaper clippings."
That comment about bulldozing the pits makes me wonder if the pits were stored outside in the summer so that they didn't need the huge barn. I'll let someone else do the math to figure out whether the Santa Clara Valley could produce 2000 tons of apricot kernels in a single season.
Wednesday, July 20, 2011
Sunday, July 17, 2011
Cleanup at Plant 51
One of the great things about the model railroad hobby is that I sometimes just get distracted from the high-priority projects on my list, and can instead just dash off on some other lark for a little while.
This weekend, for example. My to-do list (both at home and on the layout) is pretty long, but I was poking around at photos I'd catalogued on Lookback Maps, and took another look at this photo of Plant 51 from the 1920's. I'd gotten a little annoyed when I first found this photo because it showed lots of details I wasn't modeling.
Here's a look at some of the detail in that photo.
Re-examining that photo got me excited about making the building more correct - modeling the ivy, roof over the docks, and larger building just behind with the large California Packing Corporation (aka Calpac, aka Del Monte) lettering. The to-do list went out the window, except for mowing the lawns. I adding all those details in: washing the building with white paint for mortar, started building the dock roof and a flat for the background building, and added ivy on the building. There were also two painted signs visible along the loading dock - a Del Monte logo, and a list of their products. After a bit of work with the printer and some do-it-yourself decal paper, I had those signs reproduced on the model. I also ballasted the track leading into Plant 51 (or, more precisely, buried it in dirt sifted from the backyard).
Here's the before-and-after photos showing the progress this weekend. I still need to finish the dock roofs, add the background building, and add some weeds around at appropriate places.
And regardless of whether I made progress on the to-do list, I'm feeling a bit better about this corner of the layout. More news on the Plant 51 changes as they develop...
This weekend, for example. My to-do list (both at home and on the layout) is pretty long, but I was poking around at photos I'd catalogued on Lookback Maps, and took another look at this photo of Plant 51 from the 1920's. I'd gotten a little annoyed when I first found this photo because it showed lots of details I wasn't modeling.
Here's a look at some of the detail in that photo.
Re-examining that photo got me excited about making the building more correct - modeling the ivy, roof over the docks, and larger building just behind with the large California Packing Corporation (aka Calpac, aka Del Monte) lettering. The to-do list went out the window, except for mowing the lawns. I adding all those details in: washing the building with white paint for mortar, started building the dock roof and a flat for the background building, and added ivy on the building. There were also two painted signs visible along the loading dock - a Del Monte logo, and a list of their products. After a bit of work with the printer and some do-it-yourself decal paper, I had those signs reproduced on the model. I also ballasted the track leading into Plant 51 (or, more precisely, buried it in dirt sifted from the backyard).
Here's the before-and-after photos showing the progress this weekend. I still need to finish the dock roofs, add the background building, and add some weeds around at appropriate places.
And regardless of whether I made progress on the to-do list, I'm feeling a bit better about this corner of the layout. More news on the Plant 51 changes as they develop...
Thursday, July 14, 2011
Freight Car Research: 1935 Lawsuit Hints at San Jose Freight Cars
Man, those modern railroaders have it good. If they're curious what kinds of freight cars are in trains, they go to the tracks and take photos. If they're curious about how locomotives travel around, they visit one of the tracking sites to see where UP 5623 is. They've got Street View, aerial photos, etc.
That doesn't work as well for those of us modeling the past. If we want to set a scene, we have to search dusty archives, examine the background of old photos, and dig a lot deeper for not very much information.
For example, what did the freight cars look like along the tracks in San Jose in the 1930's? Should I have a lot of Southern Pacific boxcars on my layout, or a few? Were the boxcars old, or were the new steel boxcars appearing?
Some photos (such as this photo of Del Monte's Plant 51 can hint at the question. We see lots of single sheathed boxcars, and the front two boxcars are both Texas and New Orleans (a SP subsidiary), but there's so many questions left unanswered - how fast did the cars turn over? What are those cars in the back? Where are the cars going?
Luckily, there are some other sources. Tom Campbell, who models R Street in Sacramento, was doing research on what his area looked like in the 1950's, and along the way found out about a fight whether the SP had to switch cars from the Western Pacific going to a local grocery distributor.
The California Railroad Commission case over this issue included, as evidence, a list of all the freight cars that arrived at Valley Wholesale Grocery's spur from January 1935 to June 1936. Tom and I made a spreadsheet of the cars so we could sort them by railroad, origin, delivery date, or even what kind of car it was. Check out the spreadsheet and background document.
Here's some of the surprising facts I learned from the data. What do you see? Post here, or on Tom's blog entry about Valley Wholesale Grocery.
* There were 170 cars delivered to Valley Wholesale Grocery over about a year and a half. That's a new car arriving every three days for a short spur sandwiched between two other industries. That's a reasonable rate, even for a model railroad. The majority of the cars (140/170) were SP, T&NO, and PFE, with many of the cars coming from elsewhere in Northern and Central California.
* 57 of the 170 cars are, I suspect, evaporated milk and other milk products from milk plants in Ripon, Modesto, Gustine, and Galt. I didn't know that evaporated milk was so popular in the 1930's, or that it was often used as a base for infant formula.
*31 of the 170 cars are from South Vallejo, and arrive weekly. My first guess is this is flour and other products; there had been a General Mills mill there; it burned in August 1934. Time to check out some period Sanborn maps for ideas.
* Twelve cars came from Battle Creek, Michigan, and at least one was from General Foods (aka Postum), bringing probably Post cereal, Jell-O, Maxwell House coffee, and Postum. Some of these were 50' auto boxcars with larger doors intended for carrying partially disassembled wagons and automobiles. The long cars were probably good for the light and bulky packaged foods. I've got a few 50 foot boxcars on my layout, but I only use them on team tracks. I suspect they'd also be useful at some of the dried fruit packing plants, carrying Sunsweet prunes off to an eager public!
* Two of the cars came from Palacios, Texas, on the Texas coast. Palacios was a big shrimp port, so it seems like Sacramento must have liked their canned shrimp!
* All the cars from Gustine, the location of the large Carnation Milk Products cannery, were refrigerator cars. Most of the other delivered cars were boxcars. What did Valley Wholesale get in refrigerator cars? It doesn't look like they had any kind of refrigeration in the warehouse, though there was an ice cream maker in the next building in the 1950's.
* What's that Norfolk and Western coal hopper doing in Sacramento, just arrived from Peoria? Was it a typo by the railroads or California Railroad Commission, or did they heat the building with coal at the time?
So what does all this tell me about freight cars for the Vasona Branch?
* More Southern Pacific freight cars. Valley Wholesale Grocery may not be representative of my canneries, but it suggests a lot of SP cars stayed on the SP.
* More T&NO cars. There was one T&NO car arriving for every Southern Pacific car.
* More single-sheathed, outside-braced boxcars. They're about half of the boxcar fleet seen.
* Use the 50 foot auto boxcars for the packing houses sparingly.
Time to build more cars!
That doesn't work as well for those of us modeling the past. If we want to set a scene, we have to search dusty archives, examine the background of old photos, and dig a lot deeper for not very much information.
For example, what did the freight cars look like along the tracks in San Jose in the 1930's? Should I have a lot of Southern Pacific boxcars on my layout, or a few? Were the boxcars old, or were the new steel boxcars appearing?
Some photos (such as this photo of Del Monte's Plant 51 can hint at the question. We see lots of single sheathed boxcars, and the front two boxcars are both Texas and New Orleans (a SP subsidiary), but there's so many questions left unanswered - how fast did the cars turn over? What are those cars in the back? Where are the cars going?
Luckily, there are some other sources. Tom Campbell, who models R Street in Sacramento, was doing research on what his area looked like in the 1950's, and along the way found out about a fight whether the SP had to switch cars from the Western Pacific going to a local grocery distributor.
The California Railroad Commission case over this issue included, as evidence, a list of all the freight cars that arrived at Valley Wholesale Grocery's spur from January 1935 to June 1936. Tom and I made a spreadsheet of the cars so we could sort them by railroad, origin, delivery date, or even what kind of car it was. Check out the spreadsheet and background document.
Here's some of the surprising facts I learned from the data. What do you see? Post here, or on Tom's blog entry about Valley Wholesale Grocery.
* There were 170 cars delivered to Valley Wholesale Grocery over about a year and a half. That's a new car arriving every three days for a short spur sandwiched between two other industries. That's a reasonable rate, even for a model railroad. The majority of the cars (140/170) were SP, T&NO, and PFE, with many of the cars coming from elsewhere in Northern and Central California.
* 57 of the 170 cars are, I suspect, evaporated milk and other milk products from milk plants in Ripon, Modesto, Gustine, and Galt. I didn't know that evaporated milk was so popular in the 1930's, or that it was often used as a base for infant formula.
*31 of the 170 cars are from South Vallejo, and arrive weekly. My first guess is this is flour and other products; there had been a General Mills mill there; it burned in August 1934. Time to check out some period Sanborn maps for ideas.
* Twelve cars came from Battle Creek, Michigan, and at least one was from General Foods (aka Postum), bringing probably Post cereal, Jell-O, Maxwell House coffee, and Postum. Some of these were 50' auto boxcars with larger doors intended for carrying partially disassembled wagons and automobiles. The long cars were probably good for the light and bulky packaged foods. I've got a few 50 foot boxcars on my layout, but I only use them on team tracks. I suspect they'd also be useful at some of the dried fruit packing plants, carrying Sunsweet prunes off to an eager public!
* Two of the cars came from Palacios, Texas, on the Texas coast. Palacios was a big shrimp port, so it seems like Sacramento must have liked their canned shrimp!
* All the cars from Gustine, the location of the large Carnation Milk Products cannery, were refrigerator cars. Most of the other delivered cars were boxcars. What did Valley Wholesale get in refrigerator cars? It doesn't look like they had any kind of refrigeration in the warehouse, though there was an ice cream maker in the next building in the 1950's.
* What's that Norfolk and Western coal hopper doing in Sacramento, just arrived from Peoria? Was it a typo by the railroads or California Railroad Commission, or did they heat the building with coal at the time?
So what does all this tell me about freight cars for the Vasona Branch?
* More Southern Pacific freight cars. Valley Wholesale Grocery may not be representative of my canneries, but it suggests a lot of SP cars stayed on the SP.
* More T&NO cars. There was one T&NO car arriving for every Southern Pacific car.
* More single-sheathed, outside-braced boxcars. They're about half of the boxcar fleet seen.
* Use the 50 foot auto boxcars for the packing houses sparingly.
Time to build more cars!
Sunday, July 10, 2011
Plant 51: Before Renovation
It's obviously video night tonight. Check out David Hill's video of what Plant 51 looked like before renovation on YouTube.
Backdrop validation and verification
If I ever had questions about whether my Google Earth-derived backdrops were appropriate, I've now got the source material. The Santa Clara County Pioneers have uploaded a promotional video for Redwood Estates from 1927, and there are some nice panoramas of the hills as well as detail shots of Los Gatos Creek and the area around the Redwood Estates vacation subdivision. The hills look a bit more brush-covered, but it looks like the current backdrop won't need to change.
And if the prospect of clean living and a windmill wasn't enough to get you to buy a lot in Los Gatos Canyon, they also have video of Los Gatos proper. Video of the Los Gatos train station starts at 8:00.
The Blossomtime in Santa Clara County is also worth watching. It dates from the 1950's, but highlights how I ought to be thinking about what's under the trees. I've been leaving it as bare dirt but the videos show orchards with high grass (winter), short grass, and plowed earth. The San Jose Chamber of Commerce must've really liked those time-lapse blossom-opening videos, because they're sprinkled liberally through the film.
And if the prospect of clean living and a windmill wasn't enough to get you to buy a lot in Los Gatos Canyon, they also have video of Los Gatos proper. Video of the Los Gatos train station starts at 8:00.
The Blossomtime in Santa Clara County is also worth watching. It dates from the 1950's, but highlights how I ought to be thinking about what's under the trees. I've been leaving it as bare dirt but the videos show orchards with high grass (winter), short grass, and plowed earth. The San Jose Chamber of Commerce must've really liked those time-lapse blossom-opening videos, because they're sprinkled liberally through the film.
Operations on the Vasona Branch
Curious about what an operating session looks like at the Vasona Branch? Here's a time-lapse video showing the San Jose Cannery turn doing its daily switching. Thanks to Lawrence Crowl for recording the video on last Sunday's operating session. As the third showing of the layout in three days, I was starting to have problems with track and cars, so the op session had slightly more hitches than usual.
San Jose Cannery turn time-lapse video
San Jose Cannery turn time-lapse video
Saturday, July 2, 2011
The Perils of Multiple Operating Sessions
Is it naptime yet?
I am booked for three model railroad events this weekend as part of the X2011 convention. I held an operating session on Friday night, had an open house at 8am this morning, and have another gang coming over at 9:30 am tomorrow for a last operating session. Once that's done, I'm heading up to Sacramento to see the actual convention. I think I'll probably get to sleep in... oh, maybe around the 10th or so.
Operating sessions and open houses take a fair amount of effort, both making sure the model railroad is running well, getting the garage cleaned up, and getting the actual trains set up for the op session. For a garage layout, cleanup's not a trivial task because of vacuuming, sweeping, removing the debris that's moved into the garage since the last showing, cobweb patrol, etc.
For a normal operating sesssion on an evening or weekend, that's bearable; like any one-time event, all the prep is in the beginning; as long as I survive the operating session, I'm fine - the event's over, the audience is happy, and I can have a beer.
With multi-day events, that's no longer true. Suddenly there's the work of straightening and cleaning up, testing that everything still runs, and repairing any problems that turn up. Friday night - Saturday morning wasn't so bad because the need for sleep won out over everything else, but after hosting the conventioneers and the local gang of four-year-olds -- who switched boxcars very well, thank you, and all showed they could memorize the whistle sequence for grade crossings -- the crazy cleanup started.
Luckily, most of the railroad is doing fine, but one of the last things I did tonight - cleaning locomotive wheels - showed that one of my reliable engines, a Bachman 2-8-0, was having some problems moving. Uh-oh - are the backup diesels working?
"In today's performance, the role of the steam locomotive SP 3444 will be played by the slightly balky SD-7 SP 5317."
It didn't help that one of my backup steam locomotives just plain refused to move on Friday morning. The sound was fine, no motor. I'm getting a minor worry I've been cursed, and I'm running through options in case anything else fails.
So once the track was clean and the trains were set up, I dashed back into the house, and opened up the locomotive. Quick disassembly showed that the main gear on the driver has a nice half-moon cut into the top of the gear on one side, which is really annoying considering that *this* mechanism is the one I installed in January after the finicky and easily-pinched wires for the original locomotive finally went bad. I really didn't need a gear to get destroyed after two op sessions.
Luckily, the gear from the original mechanism is still working, so I swap out wheels between the old and new mechanisms, and the locomotive seems to be working ok. Fingers crossed that it survives the operating session unscathed!
[Photo: Friday night's operating session.]
I am booked for three model railroad events this weekend as part of the X2011 convention. I held an operating session on Friday night, had an open house at 8am this morning, and have another gang coming over at 9:30 am tomorrow for a last operating session. Once that's done, I'm heading up to Sacramento to see the actual convention. I think I'll probably get to sleep in... oh, maybe around the 10th or so.
Operating sessions and open houses take a fair amount of effort, both making sure the model railroad is running well, getting the garage cleaned up, and getting the actual trains set up for the op session. For a garage layout, cleanup's not a trivial task because of vacuuming, sweeping, removing the debris that's moved into the garage since the last showing, cobweb patrol, etc.
For a normal operating sesssion on an evening or weekend, that's bearable; like any one-time event, all the prep is in the beginning; as long as I survive the operating session, I'm fine - the event's over, the audience is happy, and I can have a beer.
With multi-day events, that's no longer true. Suddenly there's the work of straightening and cleaning up, testing that everything still runs, and repairing any problems that turn up. Friday night - Saturday morning wasn't so bad because the need for sleep won out over everything else, but after hosting the conventioneers and the local gang of four-year-olds -- who switched boxcars very well, thank you, and all showed they could memorize the whistle sequence for grade crossings -- the crazy cleanup started.
Luckily, most of the railroad is doing fine, but one of the last things I did tonight - cleaning locomotive wheels - showed that one of my reliable engines, a Bachman 2-8-0, was having some problems moving. Uh-oh - are the backup diesels working?
"In today's performance, the role of the steam locomotive SP 3444 will be played by the slightly balky SD-7 SP 5317."
It didn't help that one of my backup steam locomotives just plain refused to move on Friday morning. The sound was fine, no motor. I'm getting a minor worry I've been cursed, and I'm running through options in case anything else fails.
So once the track was clean and the trains were set up, I dashed back into the house, and opened up the locomotive. Quick disassembly showed that the main gear on the driver has a nice half-moon cut into the top of the gear on one side, which is really annoying considering that *this* mechanism is the one I installed in January after the finicky and easily-pinched wires for the original locomotive finally went bad. I really didn't need a gear to get destroyed after two op sessions.
Luckily, the gear from the original mechanism is still working, so I swap out wheels between the old and new mechanisms, and the locomotive seems to be working ok. Fingers crossed that it survives the operating session unscathed!
[Photo: Friday night's operating session.]
Subscribe to:
Posts (Atom)