Tuesday, September 27, 2005

Second operating session!

Dave and Scott, two friends from work came by for operations. Dave's operated on the layout when it's been more unfinished, but Scott's never operated a model railroad before. Both did fine. Scott reminded me that my switches for controlling turnouts are way too hard to find without staring at the track diagrams.

(Update: Scott's comments matched a lot of other comments. I ended up taking out the schematic maps for the switches. Instead, I inset the switches in the fascia immediately below the track each controlled. See the before and after photos to see the difference.)



No comments:

Post a Comment